Stone & hard surfaces
Warm limestone
A direction for floors, counters or feature surfaces; suitability is confirmed with the team.
Rolen portfolio / Project reference
A home connected to the horizon.
Architectural illustration · AI interpretation of the reference exterior
01 / PROJECT INFORMATION
Pacific Palisades
1225 Rimmer Ave, Pacific Palisades
Custom homes
Not published on the project page
PROJECT FLOOR PLANS
A verified floor plan is not included in the available source material. The team can confirm which drawings may be shared for this address.
Ask about this project's plans ↗Published project source ↗ · checked 2026-11-0402 / INTERIOR ATMOSPHERE
Warm limestone. Walnut. Olive linen.
03 / MATERIAL DIRECTION
A material palette for 1225 Rimmer Avenue. Three finish routes to explore.
AI material moodboard · proposed palette, not a product specification or a record of installed finishes.
Select Silver, Gold or Platinum to start the conversation. The layout stays the same; materials and detailing are developed with you.
Selections are subject to project scope, availability and written specification. A finish choice does not change the structural standard.
Explore the Rolen finish standards ↗Four complementary layers. Final products and applications are selected for the project.
Stone & hard surfaces
A direction for floors, counters or feature surfaces; suitability is confirmed with the team.
Joinery & timber
Cabinetry, paneling and selected timber details.
Stone & hard surfaces
A direction for floors, counters or feature surfaces; suitability is confirmed with the team.
Soft furnishings
Upholstery, curtains and tactile accents.
Palette studies · swatch tones are illustrative, not product samples.
04 / PROJECT INTERIORS
Project-specific interior photography is not included in the available source. Start with the material palette above and discuss the interior brief with the team.

YOUR SITE / YOUR HOME
Bring your address, your priorities and your preferred finish direction. We will review the fit and define the scope together.
Discuss 1225 Rimmer Avenue ↗No finish preference selected yet.
YOUR SITE / YOUR HOME
Bring your priorities and preferred finish direction. A fixed price follows site and agreed scope review.
Download Homes by Rolen (PDF) ↓Main home only. Garage, site work, fees and contingency are separate.